Train tunnel or trench too pricey, new study finds
BY ALLISON LEVITSKY Daily Post Staff Writer Digging a trench or boring a tunnel for the Caltrain and high-speed rail tracks in Palo Alto would cost billions and would be […]
BY ALLISON LEVITSKY Daily Post Staff Writer Digging a trench or boring a tunnel for the Caltrain and high-speed rail tracks in Palo Alto would cost billions and would be […]
Above is an aerial shot of construction of a train trench in San Gabriel in July 2016. While the trench was being excavated, the train was put on a temporary […]
© Copyright 2023, The Daily Post. All rights reserved. Privacy Policy. Terms of Use.
::after